Saltar al contenido principal
Solar panel installation in Chile — SolarPro
Certified solar installers since 2010

Best Solar Panel
Installation in Chile

Advanced Engineering for Homes and Businesses

SEC permits included  ·  16+ years of experience  ·  Certified engineering

How it works

Your solar system in 4 simple steps

We handle everything. You just decide.

1

Quote in seconds

Draw your available area (roof or ground) and get a reference quote instantly. Then share your electricity bill to fine-tune consumption and tariff.

2

Technical visit

Receive a proposal with the ideal system for you: power, panel count, estimated production and projected savings.

3

Certified installation

Our technical team installs to all SEC standards. Average residential install time: 1–3 business days.

4

Permitting & connection

We manage all permits with the distributor and activate Net Billing. Full process control.

“Energy is not
a product.
It is infrastructure.”

Carlos Jofre — Founder and CEO, SolarPro

Specialized engineering — not generic installation
Solar pioneers in Chile since 2010
Design based on your real consumption
SEC permits included in every project
Full transparency. No fine print.

Our team

Engineers, technicians and professionals committed to excellence in every project.

Carlos Jofre

Carlos Jofre

General Manager

Anja Najvirt

Anja Najvirt

Marketing Manager

Hernan Ponce

Hernan Ponce

Installations Manager

Paulina Henriquez

Paulina Henriquez

Admin & Finance

Fernando Johann

Fernando Johann

Innovation Manager

Ignacio Mayol

Ignacio Mayol

Construction Manager

Angel Gonzalez

Angel Gonzalez

PV Systems Tech

Fernando Figueroa

Fernando Figueroa

Sales Manager

Susana Pena

Susana Pena

Commercial Executive

Alejandro Paz

Alejandro Paz

O&M Manager

Sergio Escobedo

Sergio Escobedo

Operations Manager

Nicolas Astengo

Nicolas Astengo

Solar Technician

Frequently asked questions

Everything you need to know before making an informed decision.

3 kW system from CLP $3,570,000 — 6 kW from CLP $5,700,000 — 10 kW from CLP $8,500,000. Prices include materials, installation, engineering and SEC permits. No hidden fees.

For residential projects, payback is 4–7 years. For businesses, 3–5 years given higher consumption and daytime operation.

SolarPro clients reduce their grid consumption by 60–90%, depending on system size, roof orientation and consumption habits.

For a home consuming 250–350 kWh/month, a 3–5 kW system (4–7 panels of 700 Wp each) is typically enough. SolarPro sizes every system based on your actual bill.

Law 21.118 allows solar system owners to sell surplus energy back to the distributor. The value is deducted directly from the monthly electricity bill. SolarPro manages all the paperwork.

Yes, though at reduced efficiency. Panels work with diffuse light, not just direct sunlight. On cloudy days they produce 20–50% of rated capacity. Systems are sized considering your local climate variability.

Physical residential installation takes 1–3 business days. Net Billing activation with the distributor may take 2–6 weeks depending on the company (CGE, Enel, Chilquinta, etc.). SolarPro manages the full process.

SolarPro has been a pioneer in solar energy in Chile since 2010, with 16+ years of experience and 700+ projects executed across the country.

Control your energy. Control your cost.

700+ projects across Chile. Your technical evaluation is free.